'How can I specify the start and end dates for SSIS SCD type 2 wizard instead of variables
I'm trying to create a dimension table using SSIS but I'm having trouble creating an SCD type 2. I have a staging table with a business key column, a value column I want to track historical and start and end dates when changes occurred.
I am using the slowly changing dimension component in SSIS but the only date values I can write to the table is one of 3 variables (Container start time, system creation date or system start time). Is it possible to have the start and end date columns used instead?
Forgive me if this is a very basic question but SSIS is very very new to me.
Sources
This article follows the attribution requirements of Stack Overflow and is licensed under CC BY-SA 3.0.
Source: Stack Overflow
Solution | Source |
---|